User Tools

Site Tools


lighthouse_project:about

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lighthouse_project:about [2025/03/25 09:50]
sergio
lighthouse_project:about [2026/03/11 13:27] (current)
karma
Line 8: Line 8:
    
 While they share some points in common, each of these workflows should be considered separately and studied independently. Make sure to visit the Guidelines links banner at the top of the page when working on a specific workflow! While they share some points in common, each of these workflows should be considered separately and studied independently. Make sure to visit the Guidelines links banner at the top of the page when working on a specific workflow!
 +
 +
 +**NOTE** => [[lighthouse_project:​about:​lighthouse2_2stepverification|How to add the 2 Step Verification on your Apple account for Lighthouse 2 project]]
  
 **IMPORTANT** => [[lighthouse_project:​light_prod_guid_upd| Lighthouse ​ Production Guidelines and Updates]]\\ **IMPORTANT** => [[lighthouse_project:​light_prod_guid_upd| Lighthouse ​ Production Guidelines and Updates]]\\
Line 21: Line 24:
  
 //​Important:​ general order in which the certifications should be taken is:// \\ //​Important:​ general order in which the certifications should be taken is:// \\
 +
 +  * LE (Localization) - 1 hour
 +  * Preference Ranking - 6 hours
 +  * VCG Edit Model- 1.5 hours
 +  * VCG Base Creation - 1.5 hours
 +  * VCG TTI - 1.5 hours
 +  * VCG MB - 1.5 hours
 +  * CYU Website Topic - 2 hours
 +  * CYU Topic Summarization - 2 hours
 +  * CYU - 2 hours
 +  * TA Message Reply - 1.5 hours
 +  * TA Proofread 1.0 - 1.5 hours
 +  * TA Proofread 2.0 - 1.5 hours
 +  * DE (Device Expert) - 3 hours
  
   - **LE (Localization)** ​   - **LE (Localization)** ​
     * 1 hour     * 1 hour
     * Confirms that you’re a native speaker     * Confirms that you’re a native speaker
-    * Mandatory for participating in **any** of sub-projects/​workflows+    * Mandatory for participating in **any** of sub-projects/​workflows
   - **CYU and TA/TC (Summarization and Text Composition)** ​   - **CYU and TA/TC (Summarization and Text Composition)** ​
     * 1.5 hours each     * 1.5 hours each
Line 94: Line 111:
  
 This is generally known as **Preference Ranking**.\\ This is generally known as **Preference Ranking**.\\
 +
 +**Preference Ranking**: [[https://​nm.oho2.com/​s/​sToy3TRKr78PkRM|Preference Ranking_V3.3_Vendor]]\\
  
  
lighthouse_project/about.1742896258.txt.gz · Last modified: 2025/03/25 09:50 by sergio